Wednesday update.
Took day off yesterday and got a good 5-6 hours in on layout.
The
rock mold learning curve continued. Adding some more photos to get any
hints people have and also to share what I am learning hoping it saves
someone else some time and money.
Also putting rough scenery for
the redesigned Huntsman. Pulled out photos from Trip to Colorado to try
and customize the scenes to the local.
Redesigned Huntsman:
Put in cardboard webbing, installed Plaster cloth and my wife coated with Sculp-a-mold.

Here
is the Huntsman cut-out roughed in. Plenty of room for the
Section-house and small mine. Next will add rocks and determine mine
entrance.
Have this wild idea to make an animated ore car being
pushed back and forth with light in mine. Not sure if practical, but an
idea anyway. Some friends over at HON3chat are doing a lot of
animation on Blackstone loco's.
More on molds:

The before, plain roughed in wall with cardboard, plaster cloth and sculpt-a-mold to add strength.

Hopefully this gives you an idea of the (hopefully) correct consistency of the plaster.

Pour in and spread with spatula, like making a cake.

Filled mold, smoothed out. no little lines and still too glossy so not set enough to put on layout.

Little
hard to see, but as I lift the mold you can see not as glossy and
little tiny stress fractures show starting to set. Still soft enough to
mount without running out of the mold.
Lift with 2 hands and
press in place on layout. Make sure you press all around mold to get a
good bond to the rough surface. If not it will break off and your will
have tones on little rocks (ask me how I know, have a full coffee can of
broken fragments in 2 days work). Hold in place about 30-60 seconds
depending on the mold size and how well you have managed to get it to
adhere.

Mold
is in-place. I set a timer for 3 minutes and it generally worked out
well. Test a small corner to see it it comes away from the mold clean.
All mine worked but one, the plaster separated with part staying on the
mold.
The reason you want to pull off after 3-5 minutes is the
Dental Plaster is still soft enough to easily carve. This makes
blending to the next casting much easier.

The finished product.
Learned a lot so far. Blending takes some time, but with patience you can really make the two molds look like one rock face.
Tried
filling gaps with some sculpt-a-mold. Looks really good, but may end
up being an issue when staining the rock, we will see.
Thanks Cameron
Rocks, Rocks everywhere.
Well mainly in my head some would say (Grin)!
Trying some new stuff this weekend: Bragdon Enterprise Molds and Dental Plaster.
Got 6 molds all excellent quality and Joel Bragdon is first rate (no affiliation just a very satisfied customer).
Here are the molds:

This mold is large, about 2 feet wide and 18" tall. Start with a smaller mold to learn. This large mold takes some practice.

This is one great mold, lots of detail and a easy beginning one to learn.

This mold is also easy to use and makes a nice solid rock casting with limited depth, great where you don't have much depth.

This mold is deeper and has great texture. Little harder to use.

Limited depth, nice striated rock, easy to use.

This is the retaining wall mold. Cheaper than the Noch flexible and conforms to base.
Using Molds:
I
had little experience with wet molds, mainly a few Color-rite (nice
molds, inexpensive but not in the same league as the Bragdon molds).
Add 0 experience with Dental plaster and the first 3 tries were a
disaster. The 4th try was when it started to gel. First the Plaster
said 44-45 cc water to 100 g plaster. Found this was a little too
thick, so used 50 cc and decreased plaster by 10%, so 50cc water to 90 g
plaster.

Loading
plaster to water required constant agitation or stirring. don't dump
all in at once but add slowly and let water absorb plaster. after about
1/2 in it will require constant stirring, not circular but back and
forth.
Once all entered make sure all lumps broken up. You want
the plaster like pancake mix. bounce mixing bowl to remove any bubbles.
Pour in mold and use spatula to spread over mold (makes sure to spray
mold with wet water before adding plaster). Use care in spreading to
ensure no open spaces or trapped air.
Applying molds:
Spray
receiving surface with wet water. Once mold begins to film over you
can slide a hand under the mold and lift. This takes some practice.
Small tiny cracks are ok, larger cracks mean it is too far set and will
crumble when applied. This is the hardest part, but after doing a few
you will get the feel.
Place where you sprayed and press and
hold. I hold anywhere from 60 seconds to 2 minutes depending on how it
is adhering. Subsequent molds can over lap. The amount of pressure
will let you vary the mold depth and shape.

Here
is a mold drying in-place. Paul Scoles removes his after a few
minutes, I'm still trying to get a feel for this. Waiting 15 minutes
works but makes and carving difficult.

Overflow can be chipped off to make castings blend together. Paul recommends a Dental Pick.
Results:

This is the first mold shown above. Took me 3 tries to get a good casting. This is looking down grade from Beaver Brook.

This is mold 2, looks really good. This is Forks Creek.

This shows 2 molds together just downgrade from Forks Creek.

This is Forks Creek with 3 castings in-place.
So
much to learn. Made some progress, but a lot more to do and learn.
Plan to do more casting tomorrow. Will try Paul's way and remove molds
earlier so I can chip any excess away. Of the 50 lbs of plaster I got
in, used almost 1/2.
One thing that I want to try out is only filling part on the mold to give more variety.
Any hints always appreciated.
Thanks Cameron
A little more progress to report.
Enlisted
by wife to help paint ties. She does a better job than I do. Used
some gray, earth, mud, and grime then used the Min Wax Early American
stain stick once dry.
Before:

Top track has brown spray paint only. Bottom track was first attempt at painting.
After:

I think this looks much better.
Thoughts?
Thanks Cameron
Well
best laid plans to add the mine complex to Clear Creek Canyon look to
be going down in flames. The complex is too large to fit the space and
still keep Huntsman.
Before:

Here
is the image with the Banta Mine (very nice kit was my first kit in
years so over did the weathering). Takes up so much space it would
overwhelm Huntsman section house.
Proposed solution:

Sorry
blurry. This is the GrandtLine Mine (only built to this point for
sizing). Looks like it will fit better and I can cut back siding to 2
car lengths. By running tram into mountain and lighting tunnel I think
will add some visual interest. Put sound in and detail it should be
nice.
Leaves plenty of room for Huntsman after I trim Mountain back some.
Thoughts?
Thanks Cameron
Amazed at the difference.
Since
coming back from Colorado and the Narrow Gauge Convention we have been
busy with the High Holy Days. Got a little time to go back to planning
some work on the layout and having visited the sites everything is so
much easier to visualize.
Beginning redesigning Golden to take
into account the correct layout of the downtown and station and adding
the Black diamond coal mine west of town.
Looking at the maps makes so much sense now. A little bit of tweaking and I'll post the changes.
Next
on the agenda is picking up some rock molds to work on the canyon.
Lots more tock work to go. Paul Scoles book recommends dental mold,
will look into that.
Picture tomorrow hopefully.
Thanks Cameron