Sunday, November 11, 2012

Sunday Update - Details

Sunday Update - Details

Spent about 5 hours working on details. Takes a lot of time but hopefully worth it.


The tunnel entrance. Added water coming from cliff, may be too dark. Plan is to brush silicon chalk over it to look like water.


The cut with the rapids being formed.


The back of deck 2 with track ballasted and some vegetation added.


Deck 2 front, ready to add rapids and some vegetation added.


Forks Creek filled in more.


2-8-0 with 3 cars heading through the cut.











Off tomorrow so hope to work on deck 1 some.

Thanks Cameron

Saturday, November 10, 2012

Playing catch-up 7 - Last one!

Playing catch-up 7 - Last one!

Friday 9 Nov 2012.

Today was a banner day, first train ran on deck 2 back.


Blackstone 2-8-0 poking out from the tunnel.


Past Hanging rock.


2-8-0 making curve past the new foreground. Creek is between roadbed and rock (brownish area). Added tress temporarily to see how it would look.


Big Mike in cut, tight wall took some carving to clear.


Back turn with fascia. Painting the fascia really helps.


The complete curve from the outside looking in.


Ballasting at Elks Creek with beginning planning for section house foundation.


Moving back to Deck 1 rock casting front side at Huntsman. The siding will be a small mine for added interest.

Thats it for current progress, finished on a high with both loco's running. Will continue working on Beaver Brook and Deck 1 stone work tomorrow.

Thanks Cameron

Playing catch-up 6

Playing catch-up 6.

Thursday progress.


Redid the Elks Creek retaining wall, looks better now.


Here is Bridge 613 retaining walls added on deck 1. Work now moving to deck 1 to complete rock work.


Here is Deck 1 & 2 showing with fascia.


Deck 2 back with foreground rock wall.


Finally Deck 2 Front, ballasting underway.

Thanks Cameron

Playing catch-up 5

Playing catch-up 5.

Nov 7 2012

Made good progress on Wednesday. Spent time on the fascia and back of deck 2.


This shot is back of deck 2 & 3. Using 1x4 for fascia on top. Put in fascia on deck 2 and drilled for bullfrog turn-out controls. You can see the roughed out foreground in white plaster cloth at bottom of photo. On the Friday posting you can see the (almost) finished product.


180 degree turn on deck 2, both sides of rock done and dirt being put in, Chooch retaining wall in-place. The Chooch is nice stuff. Don't like the glue on back so use chalk instead. Really looks nice.


Beginning to put in ballast you can see difference here. Barkeep over on
hon3chat recommended mainly dirt, so added a touch of commercial Arizona Rock ballast to finish it off. Gives the look of narrow gauge to my eyes. Also used the Doc Ben's aged driftwood stain and instant age on ties. I like the look and it is much faster than painting each tie with different color.


Fascia on front of deck 2 & 3.


Entire length of Deck 2 front. Ready for ballasting, creek bed, vegetation and then water!


Coming out of the curve with dirt on banks and ready to ballast.


Looking down grade back of deck 2, the ledge is the same one seen as white plaster cloth above.


The last section of deck 2 back. Tunnel rock completed. Now to add vegetation and scree.

Thanks Cameron

Playing catch-up 4

Playing catch-up 4


Just a shot to solicit some advice. Put the mold up in the space between castings to try and visualize what closing the curve in would do. To close or not to close, that is the question?

Your thoughts and suggestions appreciated.

Cameron

Playing catch-up 3

Playing catch-up 3

So some more progress to share.


Back-side for Deck 2 with base stain on, fill-in still underway.


Hanging rock carved and putting in rock underneath.


Rock-work over tunnel proceeding.

More tonight or tomorrow.

Thanks Cameron

Playing catch-up 2

Playing catch-up 2

Began filling in rock on back of deck 2. The molds are great but any gaps or overlaps require work to smooth out.

Tried a mixture of molding plaster, dental plaster, plaster of paris. The dental plaster is great as it dries faster, but much harder to carve. The molding plaster varies by company so pick a type you like and stick to that brand.

It takes a lot more plaster than you might think. What you see in below 2 pictures took 50 lbs of dental plaster and 22 lbs of molding plaster (plus a little used on deck 1).


This is front of deck 2, rock work about done.


This is the backside just about all major castings in, beginning fill-in (see lower right).

Fill-in can be done many ways:
1. Easiest is sculpt-a-mold, but as a I mentioned before if you are going to stain, it is much more difficult to blend in. Over in HON3Chat they suggested using scuplt-a-mold only where dirt or scree would cover. Using Les's method of painting first eliminates this problem. I've sorta of went in the middle using both strong stain as a "paint" and thinner stain on the raw plaster. If you take your time either method will work, it becomes what you like the best.
2. Molding plaster, this is my preferred way, it is harder to position but once in place you can carve easily and stain takes roughly the same as the castings. A word of caution, the carved and even the castings don't all take stain the same. One of the main advantageous to Les's method is his painting the rock first eliminates this variable. If you use the stain only method you will need several passes to get what you are looking for.

Note on carving: just try it. If you goof, place new casting over old and try again. I use a pairing knife, a serrated steak knife and an old x-acto with #11 broken blade. I have read dental picks work really well, but don't have one yet. Carving down seems to work best for me. Use surrounding rocks as a guide and make it blend in. Also a little sprayed water or even better lite stain makes seeing easier and it carves better. Keep a paint brush handy to brush carvings to remove junk. Also, word to the wise, don't do what I did, cover your track and anything else below, both the castings and carving will make plaster that will stick to anything and ruin your scenery.

On to coloring and carving hanging rock.

This is both the first spraying of the plaster with raw sienna and the carving of hanging rock. In an earlier post there was a picture of the un-carved casting made from a Woodland Scenics dry mold.


This is an upgrade shoot showing most castings and fill-in.


Lastly a picture of the Beaver Brook station area as rock work progresses.

That's all for now - Thanks Cameron