Back from 17 day vacation with a lot of catching up to do.
Rail unloading side. Hatches in place, still need to add hinges.
Wagon loading side.
Test fit of sliding doors. Will model 3 open, one closed. Removable slats will go across door to hold coal from spilling out.
Will cut remaining doors and mount, then add channel up top.
Thanks Cameron
No comments:
Post a Comment