Tuesday Update.
Worked
on initial placement of track for Forks Creek. Used Forks Creek Eatery
and base of Forks Creek Station (under Construction) to work on track
alignment. Will begin cutting creek this weekend. Need to move turnout
slide tie to opposite side per prototype.

Thanks Cameron
Got a Hakko FX-888 Solder Station in. Was between it and the Weller unit.
The Hakko at first impression is a really nice unit. The colors are a little
weird (blue and yellow) but unit is in 2 parts, transformer with temp control
and the solder stand with 3 types of cleaner (wire, rubber and sponge). I
really like the wire following Scoops videos.
The specs say 30 warm up and the temp control claims to be accurate at +/- 1.5
degree. Dial is in both C & F. it has a lock and a calibration setting screw.
An indicator light shows when warming.
First test was impressive compared to my cheapy Weller Station I got from
Micro-Mark. At 250 C the tip immediately tinned. Watching unit it is switching
on and off every 5-10 seconds to keep tip hot.
The solder stand though it looks funky is much better than the wire coil one.
the iron itself is a joy to hold, much lighted and design fits hand much better
than Weller.
I really wanted to buy the better Weller, made in US and all that. But I think
this is a better iron. Time will tell.
Like I said, First impression is very good. Will try on a Turn-out build and an
smd to see real results.
Any hints on SMD temp to use and temp for rails? So much to learn. The
instructions did say to recalibrate when changing tips. Says need a device to
measure tip temperature, anyone got any suggestions for this? Also need to get
soe other tips, came with a small chisel, need a really tiny one for SMD's.
Thanks Cameron
Sunday 6 May Progress!
Good Weekend, got alot done. Focusing on the middle peninsula deck 2 almost exclusively thought beginning work on Forks Creek.
Got several questions I'd like to as advice on:
1. Using Harp switch stands for mainline turn-outs (plan is to have
bullfrog turn-out controls to actually move the points). Unsure what to
use for yards. The DPDT switch to move pionts as shown on Gerry's page
on NMRA AU site looks good, but what would work for some kind of
indicator?
2. Roadbed, I thought putting track directly on
Blackboard using track nails would work. It is allowing too much
lateral movement. So should I add roadbed on top of blackboard? If I
were to want to secure track to either new roadbed or Blackboard what is
best way (Chalk, Glue, spikes)?
3. Proto-freelance, Clear Creek
had no tunnels, I have one 180 degree turn that I need to hide, it drops
from about 11" to about 6" for the turn, so no room for light or
scenery. Any ideas: use tunnel, use frames to make like a shadow box,
hide some other way?
4. On Picture 4 - which color seems best for a limestone type ballast?
Here are the progress photos:

Cardboard web turning front 180 between Beaver Brook and Elk Creek.

Webbing showing rough-in for Beaver Brook.

Better
view of Beaver Creek, you can see ledge where pavilion will go. The
block of wood is a stand-in for the the station / restaurant.

Need
Advice, which color seems best for a limestone type ballast? C&S
used local rock to build these up? This is the grout I picked up in
response to a great posting on Layout Construction sub-forum.

Looking upgrade this is Elks Creek rough-in. Sorry for the over exposure on the plaster.

Looking
towards Forks Creek. The creek you see had to be moved downgrade
(towards camera) to make room for Forks Creek ( a 3 turn-out wye with
legs that go to Blackhawk and Idaho Springs).
To be continued in Part 2.
Thanks Cameron