Here is right wall.
Here is left / Front corner where bridge to Golden goes.
Here is the location of the Smelter, the mainline with turn-outs are going in. Used FasTracks idea of using a jeweler saw to cut gaps on frogs, much better than a dremel.
Monday I completed Deck 1 lighting (all except middle peninsula which will be LED).
"Golden gets lighting, citizens demand train and buildings." Here is the completed lighting at Golden. Starting to layout track to verify plan.
All in all good progress considering all that was going on.
No comments:
Post a Comment